Wohong has been deeply engaged in oil and gas recovery for 10 years Get a free quote

Company News_Project delivery progress and company news

The company news section of Luoyang Wohong Petrochemical Equipment Co., Ltd. releases updates on project delivery progress, manufacturing chronicles, technical exchanges, and team dynamics, documenting Wohong's development journey in the field of oil and gas recovery equipment.

Company News

How to arrange the cleaning operations for the three times of oil and gas recovery equipment? Coordination points and manufacturer's supporting services

设备清洗不只是外观问题,还关系检测数据与运行状态。本文梳理清洗周期安排、作业配合要点与厂家配套服务。

Company News

How to maintain the appearance and rust prevention of the three-stage oil and gas recovery equipment? Maintenance points and manufacturer's supporting services

In oil and gas areas, moisture and corrosion coexist, and the appearance and rust prevention maintenance of equipment are often overlooked. This article outlines the key points of maintenance and the manufacturer's supporting service arrangements.

Company News

How to deal with abnormal noise and high vibration of oil and gas recovery equipment? Inspection points for fan bearing and pipeline fixation

Abnormal noise and vibration are often caused by three root causes: wear and tear of rotating parts, looseness, and surge flow. This article clarifies the identification methods, key inspection points for fan bearings and pipeline fixation, as well as the disposal and recovery process.

Company News

How to conduct winter electrostatic protection for three-time oil and gas recovery equipment? Inspection points and manufacturer service arrangements

The risk of static electricity increases during dry winter, so it is necessary to inspect the electrostatic protection of oil and gas recovery equipment in advance. This article outlines the key inspection points and the winter service arrangements provided by manufacturers.

Company News

How often should the adsorbent be replaced? How to determine if the activated carbon needs to be replaced?

The replacement cycle for activated carbon is typically one to three years. To determine whether it's time for replacement, one should consider three indicators: the breakthrough curve, pressure drop, and recovery efficiency. This article clarifies the criteria for determining the replacement cycle and outlines the key points for replacement operations.

13526990215 WhatsApp
WhatsApp contact