Wohong has been deeply engaged in oil and gas recovery for 10 years Get a free quote

Company News_Project delivery progress and company news

The company news section of Luoyang Wohong Petrochemical Equipment Co., Ltd. releases updates on project delivery progress, manufacturing chronicles, technical exchanges, and team dynamics, documenting Wohong's development journey in the field of oil and gas recovery equipment.

Company News

How to arrange the handling and lifting of the three oil and gas recovery equipment? Key points for on-site positioning and installation coordination

From the time equipment leaves the factory to its placement, handling and lifting are the most prone to go awry. This article outlines the key points for arranging and on-site coordination for the handling and lifting of three oil and gas recovery equipment.

Company News

How to install a membrane check segment in an existing condensation device? Transformation process and business downtime arrangement

When emission standards are raised or testing fails to meet standards, it is a common modification approach to install a membrane control section in existing condensation devices. This article explains the key points of evaluation, the process, and the arrangement for business suspension.

Company News

What are the acceptance documents for membrane-based oil and gas recovery? Dual indicators and document checklist

The acceptance inspection of membrane-based oil and gas recovery focuses on both recovery rate and emission concentration. In this article, the acceptance documents are listed in four categories, and the stations are checked against the checklist.

Company News

What are the site requirements for a skid-mounted membrane separation device? Layout and interface checklist

The premise for the rapid mobilization of skid-mounted devices is that the site preparation is in place. This article lists the site conditions, interface checklist, and layout considerations.

Company News

How to implement the membrane separation oil and gas recovery solution? From site survey to device commissioning

Before implementing the membrane separation solution, it is necessary to understand the gas volume, concentration, and site conditions. This article describes the complete process from survey to commissioning and acceptance.

13526990215 WhatsApp
WhatsApp contact