Luoyang Wohong Petrochemical Equipment: Customization of Skid-mounted Three-stage Oil and Gas Recovery Equipment and Technical Renovation Services for Operating Gas Stations

Introduce the customization capabilities of Luoyang Wohong Petrochemical Equipment Co., Ltd.'s skid-mounted tertiary oil and gas recovery equipment, as well as the technical renovation service process for operational gas stations and oil depots, covering survey and design to commissioning and acceptance.

When it comes to tertiary oil and gas recovery at operational gas stations and oil depots, there are two major concerns: firstly, the long construction period that disrupts business operations, and secondly, the mismatch between equipment and site conditions. To address these two pain points, Luoyang Wohong Petrochemical Equipment Co., Ltd. offers customized services for skid-mounted tertiary oil and gas recovery equipment, as well as comprehensive services for technical renovation of operational sites. The equipment is integrated into skid-mounted units in the factory, which can be put into operation upon on-site installation and connection. The technical renovation project is handled by one company from survey, design, manufacturing, to installation and commissioning, ensuring a seamless process. The owner only needs to deal with one company.

What scenarios are suitable for the skid-mounted solution

The skid-mounted tertiary oil and gas recovery equipment integrates the condensing unit, buffer, control, and metering units into a single unit for pre-assembly in the factory. Upon arrival at the site, the foundation is in place, the inlet and outlet pipelines are connected, and the equipment is powered on for commissioning. The installation workload is significantly reduced compared to on-site assembly of separate components. The skid-mounted solution is particularly advantageous for operational gas stations with limited space, oil depots with limited renovation windows, and projects that require rapid commissioning.

Typical applicable scenarios

  1. For the three times of new construction or replacement of old equipment for oil and gas recovery at the gas station in the camp, the downtime is required to be short;
  2. The renovation project for breathing exhaust gas recovery in the oil depot tank area faces challenges due to limited space and complex pipeline routing;
  3. There are stations that have already undergone primary and secondary recycling, and need to supplement the tertiary recycling process;
  4. For urban stations with requirements regarding land occupation, noise, and appearance, the skid-mounted appearance can be customized.

The complete process of technical transformation services

The difference between a technical renovation project and a new construction project lies in the fact that the former involves "designing with the current situation in mind". Therefore, site inspection and current situation assessment play a significant role in the process. Wohong's technical renovation services are carried out in the following steps, with clear deliverables at each step that the owner can inspect and accept one by one.

Service implementation steps

  1. On-site inspection: Measure the dimensions of the site, verify the direction and elevation differences of the pipelines in the tank area, and assess the scope of existing recycling pipelines that can be reused;
  2. Scheme design: Determine equipment scale and skid-mounted layout based on gas volume and composition, and issue layout drawings and construction plans;
  3. In-plant manufacturing: integration and factory inspection of skid-mounted units, pipeline pre-installation, and power-on pre-commissioning;
  4. On-site installation: Utilize off-peak business hours or nighttime windows for construction, including positioning, connecting pipes, and wiring, to minimize downtime;
  5. Commissioning and acceptance: Conduct actual measurements of condensation outlet concentration and recovery volume, simultaneously train station personnel, and deliver operation and maintenance documents.
Luoyang Wohong Petrochemical Equipment: Customization of Skid-mounted Three-stage Oil and Gas Recovery Equipment and Technical Renovation Services for Operating Gas Stations

Comparison between skid-mounted customization and traditional split installation

Comparison itemSkid-mounted customization solutionTraditional split-type on-site installation
On-site construction periodPre-assembly in the factory, with on-site placement and connection as the main approachOn-site assembly and debugging, with the duration greatly affected by weather and site conditions
quality controlPre-commissioning is conducted comprehensively before leaving the factory, ensuring it is nearly ready for use upon arrivalWelding and piping are completed on-site, and the quality relies on the construction conditions
Site adaptabilityCustomized layout according to on-site dimensions, ensuring compact footprintDue to the limitation of standard equipment dimensions, there is little room for layout
Impact on business operationsThe construction window is short, suitable for operation at the stationThe construction period is long, causing significant disruption to business operations

Service guarantee after delivery

The commissioning of equipment is not the end of service. Wohong establishes operation archives for delivered projects, provides regular follow-ups and maintenance guidance, stocks vulnerable spare parts according to machine models, conducts remote diagnosis first when equipment status is abnormal, and arrives on-site for handling if necessary. For owners of multiple stations, the operation data of each station can be managed in a unified ledger, and an analysis of operation and recycling volume can be provided quarterly, ensuring that the accounts of each equipment are clear and transparent.

Frequently Asked Questions

What are the requirements for the foundation of skid-mounted equipment?

Generally, hardened ground with equipment foundation is sufficient. The specific load-bearing capacity and dimensions are confirmed during the survey phase. Channel steel bases are commonly used for transitions in renovation projects, with minimal civil engineering modifications.

How long will the business be suspended during the renovation of the camp station?

Most project pipelines are prefabricated in the factory, and on-site construction is arranged during low business hours, so downtime can be compressed to a very short period. The specific schedule will be provided during the planning stage.

Can the old equipment be repurposed?

After inspection and evaluation, intact pipelines, recovery pumps, etc. can be incorporated into the new plan for reuse to avoid duplicate investment; reasons for replacement will be listed item by item for sections that do not meet the requirements.

This article is compiled by Luoyang Wohong Petrochemical Equipment Co., Ltd. The company provides design and manufacturing, skid-mounted customization, installation and commissioning, as well as after-sales operation and maintenance services for three-time oil and gas recovery equipment to gas stations and oil depots. If you need on-site inspection or scheme configuration, please feel free to contact us for discussion.

Previous: Introduction to Installation Guidance and On-site Debugging Services for Luoyang Wohong Petrochemical's Three-Stage Oil and Gas Recovery Equipment Next article: Luoyang Wohong Petrochemical Equipment: Introduction to Services for Nitrogen Sealing and Breather Valve Matching of Storage Tanks