Wohong has been deeply engaged in oil and gas recovery for 10 years Get a free quote

Oil and gas recovery technology article_Three-stage recovery principle and selection guide

The "Oil and Gas Recovery Technology" article column shares insights into the working principles of three times of oil and gas recovery, a comparison between condensation and adsorption processes, key points for equipment selection, and experiences in achieving emission standards under GB 20952. These insights have been compiled by the technical team of Luoyang Wohong Petrochemical Equipment Co., Ltd.

Industry News

How to achieve informatization of the gas station's oil and gas recovery ledger? Digital ledger ideas and implementation steps

The oil and gas recovery ledger is undergoing a transition from paper-based to digital. This article outlines the approach to the informatization of the ledger, data item organization, and step-by-step implementation methods.

Company News

How to manage the accompanying documents of three sets of oil and gas recovery equipment? Key points for archive list and handover services

The accompanying equipment documentation serves as a crucial basis for operation, maintenance, and repair. This article outlines the key points for documenting and handing over the information list related to three rounds of oil and gas recovery equipment.

Technical Article

Key points of explosion-proof design for membrane oil and gas recovery equipment: zoning and electrostatic grounding

The membrane oil and gas recovery device operates in a combustible gas environment. This article outlines the design essentials for explosion-proof zoning, equipment selection, and electrostatic grounding, which can serve as a reference for new construction and renovation projects.

Industry News

How to arrange the annual inspection of the oil and gas recovery device? The pace of self-inspection and inspection submission

Annual inspection is a routine checkpoint for the operation of oil and gas recovery devices. This article explains the composition of inspection items, the division of responsibilities for self-inspection and inspection submission, and the practice of data record linkage.

Company News

How to ensure the proper installation of vapor recovery systems in newly built gas stations? Reservation and selection during the design phase

The vapor recovery system for new gas stations must be fully equipped during the design phase. This article outlines the configuration of the three-stage recovery system, the list of reserved interfaces, and the key points for acceptance inspection.

13526990215 WhatsApp
WhatsApp contact