Wohong has been deeply engaged in oil and gas recovery for 10 years Get a free quote

Oil and gas recovery technology article_Three-stage recovery principle and selection guide

The "Oil and Gas Recovery Technology" article column shares insights into the working principles of three times of oil and gas recovery, a comparison between condensation and adsorption processes, key points for equipment selection, and experiences in achieving emission standards under GB 20952. These insights have been compiled by the technical team of Luoyang Wohong Petrochemical Equipment Co., Ltd.

Industry News

How to adjust the gas-liquid ratio of the fuel dispenser when it exceeds the standard? Adjustment process for detection data and valve inspection

If the gas-liquid ratio exceeds the standard, first check for mechanical reasons before adjusting the valve components. This article explains the judgment of deviation direction, inspection items before adjustment, and the adjustment process.

Company News

How to organize the installation and commissioning of three sets of oil and gas recovery equipment? On-site conditions and commissioning process arrangement

Installation and commissioning is the most challenging step for organizations in the delivery process. This article explains the verification of on-site conditions, installation sequence, and arrangement of commissioning procedures.

Technical Article

How to troubleshoot the high exhaust concentration of the oil and gas recovery device for three times? Inspection ideas for the recovery section and the check section

A high exhaust concentration indicates that the recovery or control section has failed to collect the components that should be collected. This article outlines a step-by-step inspection approach from air intake to exhaust.

Industry News

How to manage spare parts for oil and gas recovery equipment? Determination of commonly used parts list and inventory base

The goal of spare parts management is not to stock excessively, but to ensure that necessary parts are available without tying up funds in inventory. This article explains the methods for compiling a list of commonly used parts and determining the inventory base.

Company News

How to arrange the construction organization of the oil and gas recovery project? How to handle the connection of construction periods and the handling of downtime windows

Oil and gas recovery projects are often implemented at operational stations. This article explains the preparation of construction organization, scheduling of construction periods, and arrangement of downtime windows.

13526990215 WhatsApp