Wohong has been deeply engaged in oil and gas recovery for 10 years Get a free quote

Oil and gas recovery technology article_Three-stage recovery principle and selection guide

The "Oil and Gas Recovery Technology" article column shares insights into the working principles of three times of oil and gas recovery, a comparison between condensation and adsorption processes, key points for equipment selection, and experiences in achieving emission standards under GB 20952. These insights have been compiled by the technical team of Luoyang Wohong Petrochemical Equipment Co., Ltd.

Industry News

What should be confirmed before oil unloading operations? A standardized checklist for electrostatic grounding and return gas connections

The risks in the oil unloading process are primarily due to inadequate preparation. This article outlines the confirmation process and record-keeping requirements, covering everything from electrostatic grounding and interface inspection to process monitoring.

Company News

How to conduct seasonal maintenance for the three-time oil and gas recovery device? Key points for operation adjustment in summer and winter seasons

Temperature is the primary external variable affecting the operation of the recycling device. This article explains the inspection focuses and operational adjustments for high temperatures in summer and low temperatures in winter.

Industry News

How to prepare for the acceptance inspection of oil and gas recovery at a newly built gas station? Procedures, materials, and common rectification items

If the preparation for acceptance is thorough, the chances of passing the inspection in one attempt are high. This article outlines the key points for preparation based on system self-inspection, checklist of materials, on-site inspection areas, and descriptions of common rectification items.

Company News

How to connect the warranty service of the three times of oil and gas recovery equipment? Repair process and user cooperation matters

The warranty period is not a topic that ends with the signing of the contract. This article explains the connection methods for warranty period services, the repair process, and the cooperation matters with the user side.

Technical Article

How to reserve a suitable location for the tertiary oil vapor recovery equipment in the tank farm of an oil depot? What are the key points for arranging spacing and layout

Determining the location of the tertiary oil and gas recovery equipment during the layout phase of the tank area is more convenient than finding a place after the main structure is installed. This article explains the spacing relationships, maintenance space, and pipeline routing considerations during layout.

13526990215 WhatsApp
WhatsApp contact